|
|
Auftraggeber: | Kali + Salz GmbH |
Bearbeitungszeitraum: | 1992 - 1994 |
Unsere Leistungen: | Determination and analysis of the long-term safety necessary for the authorisation for the subsurface deposit for highly toxic waste in the Salt Mine of Zielitz.
| | |
Evaluation of geological, hydrogeological, rock mechanical, tectonical, and mining facility data
| • | Definition of appropriate analytical methods for long-term safety
| • | Co-ordination with relevant technical authorities
| • | Ground water flow and transport model to predict the impact of relevant safety methods on the quality of the ground water in upper aquifer systems
| • | Consultation in public relations projects
|
| | | |
|
|